top of page

Outdoor LCD Solutions for Transportation Projects

​Plan transportation outdoor LCD displays around passenger viewing, site access, installation conditions, and content responsibilities before selecting a configuration.

Prepare a non-confidential summary of the passenger task, site and installation concept.

Zurich Enge railway station entrance and public transport information area

Start with the passenger's information task

A transportation display should be planned around how passengers actually use the information. Start by defining who needs to read it, whether they are moving or waiting, and where they will approach or stand. These decisions help determine which display direction is worth investigating before a configuration is selected.

Passengers waiting on a subway platform beside passenger information displays

Describe whether passengers need to identify a destination while approaching, read departure information while waiting, or find a service point before joining a queue. Also identify who supplies schedules or messages, who controls the content system, and who checks the displayed information. Treat any connection to a live feed or another operational system as a project interface to define, rather than an assumed display feature.

Define the location before selecting a format

Transportation sites can differ greatly even within the same terminal or station. Define the viewing position, exposure, installation constraints and operating responsibilities before narrowing the display format.

Viewing position and exposure

A sheltered entrance, an exposed forecourt and a position beside a glazed waiting area should be described separately. Note sun direction, shade, reflective surfaces, viewing distance and installation height where known.

Installation and operating responsibilities

Establish who controls the mounting location, supporting structure, power and network boundaries, and access for maintenance. These responsibilities should be clarified before configuration selection.

Site differences across one project

If several positions are planned, identify their differences instead of treating the whole transportation site as one environment. Separate locations may require different display directions, mounting concepts or access considerations.

Choose a solution direction to investigate

The right format depends on how passengers use the information, where the display will be installed, and how the site can support access and maintenance. Use these directions to narrow the project before selecting a specific configuration.

Display-led installations

If the requirement is primarily a screen at a defined site position, begin with the Outdoor Displays family. Describe the available space and intended supporting arrangement first. The family route is a starting point for selection, not confirmation that a listed model meets the passenger task or site requirements.

Freestanding kiosk arrangements

If the installation concept is a freestanding information point, explore Outdoor Kiosks and identify which viewing faces, footprint and service access the site needs. Keep screen communication separate from interaction or self-service functions: any required function needs its own supplied-scope and configuration review.

System interfaces to define

Before configuration selection, identify who is responsible for content, connectivity, power and network boundaries, installation and maintenance access. Where something is undecided, keep it as an open project question rather than assuming it is included with the display.

Review the system interfaces that affect selection

Transportation display selection is not only about screen format. Site conditions, mounting and access, content responsibilities, and system interfaces should be considered together before a configuration is chosen.

Site, enclosure and access

Viewing, enclosure, mounting and access requirements need to be considered together. A chosen location can affect exposure and the space available to install or maintain the system. Use the Outdoor LCD Engineering Guide for the wider system framework rather than fixing an enclosure or mounting solution from this page.

Urban street intersection showing outdoor information display placement and pedestrian access context

Content and integration boundaries

Before configuration selection, name the parties responsible for content, connectivity, interfaces and acceptance. Where something is undecided, state it as an open question. The Specification and RFQ Guide provides the fuller method for describing responsibilities and requesting applicable evidence.

Apply the selection to two passenger settings

Consider a forecourt information point read from two approach paths. The initial discussion should distinguish the information needed on each approach, the allowed footprint and how maintenance access can be kept available. A terminal entrance display raises a different starting question: where can passengers pause to read without obstructing the route? These are hypothetical planning contexts, not SUNTUNE customer installations or claimed outcomes.

Two pedestrians using an urban bike-rental station beside a city street
Large outdoor digital advertising display in a railway station environment

Prepare a non-confidential project summary

An initial summary can remain brief. Include what is known and mark what still needs a decision:

  • ​Passenger-information task, content type, and whether viewers are moving or waiting.

  • Country/region, site-position type, sun/shade context and approximate viewing position.

  • Intended mounting or freestanding arrangement, approximate quantity and project stage.

  • Responsibility for content updates, power/network interfaces, installation and maintenance access.

  • Mandatory project requirements or evidence questions, identified as requirements rather than proven capabilities.

Start your transportation display project

Share the passenger task, location and installation direction you want to discuss. A final model choice is not needed to explain the initial need.

Keep the initial summary non-confidential. Do not submit confidential RFQs, drawings, tender documents, credentials or private specifications through the public intake.

bottom of page